Vedant Tech Services

Our Approach for Computer System Validation

We Provide Following Documents as per GAMP 5 Requirements.

  •   Validation Master Plan (One Time)
  •   Gap Assessmet (GAP)
  •   Initial Risk Assessment (IRA)
  •   21CFR Part 11 compliance services (Where ever applicable)
  •   User Requirement Specification (URS) If Required
  •   Validation Plan (VP)
  •   Functional Specification (FS) If Required
  •   Design Specification (DS)If Required
  •   Functional Risk Assessment Document (RA)
  •   Installation Qualification (IQ)
  •   Operational Qualification (OQ)
  •   Performance Qualification (PQ)
  •   Traceability Matrix (TM)
  •   Validation Summary Report (VSR)

© 2019 Vedant Tech Services. ALL RIGHTS RESERVED.